New in Presently

Private lessons that schedule themselves.

Publish your instructors' availability, let families self-book through the portal, and bill them automatically. No more text-message scheduling, no more spreadsheet conflicts, no more chasing payments.

No credit card required. Free migration assistance.

yourstudio.usepresently.com/portal/privates
The family portal page where parents browse and claim open private lesson slots

Scheduling privates by text doesn't scale.

Most studios still coordinate every private lesson over text messages with instructors. It works until it doesn't.

Without Presently
  • ✕ Parents text instructors directly to find a time
  • ✕ Instructors book rooms by checking a wall calendar or asking around
  • ✕ Two students get double-booked in the same room
  • ✕ Front desk chases payments after each lesson
  • ✕ Owners have no idea who's taking privates, how often, or from whom
With Presently
  • ✓ Admin publishes a month of availability for each instructor
  • ✓ Families self-book from the family portal, no texting required
  • ✓ Conflicts with group classes and other privates are blocked automatically
  • ✓ Charges hit the family's ledger the moment they book
  • ✓ Full reports on bookings, revenue, and instructor utilization

From availability to enrollment in four steps.

Quick to set up the first time, fast to maintain after that.

1

Publish availability

Use the quick form (great for "Tuesdays + Thursdays, 3-7 PM") or drag-to-paint on the calendar (great for irregular schedules). Pick the slot length and price, hit save.

2

Families self-book

Parents log into the portal, see open slots, click one, pick their student, and confirm. The charge is added to their ledger automatically. Optional: book a recurring weekly series in one click.

3

Instructors get notified

The instructor gets an email when a slot of theirs is booked. Their schedule view shows every upcoming private alongside their group classes.

4

Manage and report

Cancel, reassign to a sibling, or check who's getting the most privates with built-in reports on revenue and utilization.

Designed for how studios actually run privates.

The details that make this work in practice, not just in theory.

Two ways to build a schedule

Quick form for predictable schedules. Drag-to-paint calendar for irregular ones. Both produce the same set of bookable slots and respect existing class times.

Conflict-free by default

Group classes block the same room. Two privates in the same room at the same time are impossible. Database-level locking means two families clicking "book" at once can't both win.

Recurring bookings

Families can book "every Tuesday at 4 for the next month" in one click. Unavailable weeks get skipped silently with a clear summary of what was booked vs missed.

Auto-billed to the family ledger

Booking a slot creates a pending charge in the family's existing ledger. No separate billing system, no after-the-fact invoicing. Refunds happen automatically on cancellation.

Cancellation windows

Set how close to the lesson families can self-cancel. Inside the window, families have to call. Admins can always cancel (instructor sick day, weather closure) and the family gets credited automatically.

Sibling reassignment

Family booked Emma but actually Noah is the one going? One click reassigns the booking to a different student in the same family. The charge stays put.

Email confirmations

Families get a booking confirmation when they claim. Instructors get notified that a new private is on their schedule. Cancellations trigger emails too. All branded to your studio.

Revenue and utilization reports

See which instructors have the busiest schedules, what your privates revenue looks like over any date range, and how much of your published inventory is actually getting booked.

Built into the system you already use

No separate tool to learn. Privates use the same families, students, instructors, rooms, and ledger as the rest of Presently. One login, one dashboard, one source of truth.

For the studio

Build a month's schedule in minutes.

Pick an instructor, a room, the days and times. Set the slot length and price. Hit save. Presently generates the slot inventory, skips anything that conflicts with existing group classes, and publishes it to the family portal.

Need an irregular schedule? Switch to the calendar tab and paint availability windows by day. Same end result.

The admin build-schedule page with a calendar where the admin paints availability windows for the week
The family portal slot browser with open slots grouped by date
For the family

Book in three clicks.

Open the portal, see what's available, pick a time. Choose the student, confirm. That's it. The charge hits the family's account immediately, and a confirmation email lands in their inbox.

Want recurring lessons? One dropdown turns a single booking into a weekly series.

Visibility

Finally know who's taking privates.

Most studios have no idea which students are doing private lessons, which instructors are doing the most, or how much revenue is on the table. Built-in reports answer all of it.

Filter by month, instructor, or student. See utilization (booked vs available) so you know when to add more inventory.

The privates report showing revenue and utilization by instructor

Stop scheduling privates by text.

Try Presently free for 30 days. We'll help you migrate from whatever system you're using today, so you can start with your real schedule in place.

Ready to Transform Your Studio?

Start your free 30-day trial today. No credit card required.

Start Free Trial